Freshpak had built a new hummus production area which required heavy-duty polyurethane screeds. We prepped the area with the diamond grind to give it a mechanical bond. We then primed the area DPM epoxy primer. The SBR polymer-modified granolithic screed was laid at an average thickness of 50m to falls.
Since completing this project we have carried out further work with Freshpak and are still working with them to plan future work.